Summer Palace Progress


A small update of the Summer Palace and what has been going on. Coming on slowly through these cold winter months, but now as the days are getting longer and lighter its becoming easier to progress and work. Chris has just made an extended outdoor porch/ seating area in front of the up-cycled barrelled plant pots that are nearly sprouting, also the pond/fountain that is still incomplete is nearly ready for a clean out and for pipe work to be installed. And for the rest of the Summer Palace there is a lot more to be done, the inside has still not been touched but we are waiting for the sun to come out so we can carry on this amazing project.

4 thoughts on “Summer Palace Progress

  1. Piper Dingus says:

    F*ckin’ tremendous things here. I’m very satisfied to peer your article. Thanks so much and i’m having a look forward to touch you. Will you please drop me a e-mail?

    Reply
  2. Jeffrey Harthcock says:

    I am not sure the place you’re getting your information, but great topic. I needs to spend some time learning more or figuring out more. Thank you for fantastic information I used to be searching for this information for my mission.

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *